Increasing the production

The Baobab field in the Ivory Coast continues to deliver reliable, continuous production. During 2018, we drilled three production wells and continued the process of drilling one additional producer, two water injectors as well as an appraisal well in 2019. Large oil deposits tend to grow, and that goes for Baobab as well. At the beginning of 2018 our production was approximately 20,000 bbl/day. In late 2018, we had a production of 30,000 bbl/day.